Megrendelés, számlázás


Tel.: 06/30-523-1179

Hotline/terméktámogatás

 

Tel.: 06/30-523-1179

Nyitvatartás

Hétfőtől péntekig 8:30-17:00

szombaton és vasárnap zárva

Cím, elérhetőség

Maróti Kft.

1205 Budapest XX.
Nagykőrösi út 91.

Autodata belépés
Facebook
Legújabb frissítések
Autodata D&R Demo

Virar-alibaug Multimodal Corridor Route Map Site

Travel between Virar and Alibaug will be reduced to just over an hour.

It intersects key arterial roads, including: NH-48 (Mumbai-Ahmedabad) Mumbai-Nashik Highway (NH-160) Mumbai-Pune Expressway NH-66 (Mumbai-Goa Highway) Ending Point: Near Alibaug/Balavali (NH-66). virar-alibaug multimodal corridor route map

Virar Alibaug Corridor: Road Map | Status | Village List | Latest News Travel between Virar and Alibaug will be reduced

The is a game-changing ₹31,793 crore mega-infrastructure asset designed to structurally redefine transport across the Mumbai Metropolitan Region (MMR) . Spearheaded by the Maharashtra State Road Development Corporation (MSRDC) , this 126.06-kilometer access-controlled greenfield expressway features a massive 14-lane configuration. Acting as a critical strategic bypass, the corridor diverts commercial freight and long-distance passenger traffic completely away from Mumbai’s saturated central core. The blueprint condenses travel times between northern Palghar and southern Raigad from an arduous 5 hours to a smooth, rapid 90-minute commute. rapid 90-minute commute.

virar-alibaug multimodal corridor route map