Route the main power cable through a liquid-tight strain relief bush into the control box.

The Crawford CDM9 operator, when paired with the ECS 950 control unit, is a standard setup for industrial overhead sectional doors. Installation involves mounting the drive unit to the door shaft and configuring the control system's limits. 1. Mechanical Installation of the Drive Unit crawford cdm9 950 installation manual

: Carefully unpack the system components and verify that all parts are included. The package should contain the main controller unit, card readers, wiring harnesses, and any additional accessories specified in the manual. Route the main power cable through a liquid-tight

Before beginning the installation, ensure the door is in peak mechanical condition. The CDM9 950 is a drive unit, not a tool to fix a broken door. crawford cdm9 950 installation manual